CH / EN

Introduction to

Parent Companies

CRRC Nanjing Puzhen Co., Ltd

About

Learn more from our official

account on WeChat!

Partner website: 

https://www.bombardier.com

http://www.crrcgc.cc

 

As a core subsidiary of CRRC, CRRC Nanjing Puzhen Co., Ltd is mainly specialized in the manufacture of urban rail vehicles, inter-city trains, modern trams, railway coaches and major core parts, etc. The company is a professional researcher, integrated supplier and solution provider in domestic railway passenger transport and urban rail transit equipment.

About Bombardier Transportation

Address

Service

© 2018 - 2020 Business UI Kit. All right recived

Bombardier Transportation is a global mobility solution provider leading the way with the rail

industry’s broadest portfolio. It covers the full spectrum of solutions, ranging from trains to

sub-systems and signalling to complete turnkey transport systems, e-mobility technology and

data-driven maintenance services. Combining technology and performance with empathy,

Bombardier Transportation continuously breaks new ground in sustainable mobility by providing

integrated solutions that create substantial benefits for operators, passengers and the environment. Headquartered in Berlin, Germany, Bombardier Transportation employs around 39,850 people and

its products and services operate in over 60 countries.

RODUCTS

Contact Us

CRRC Puzhen Bombardier Transportation Systems Co.,Ltd

Contact: Ms. Yang

Phone: 0553-5809188

Mailbox: idtet@idtet.com

Address: No.69, Mengxi Road, Wuhu Economic and Technological Development Zone

Page view
Product

Shenzhen Airport APM

Affiliate classification
没有此类产品
Product description

  Shenzhen Airport APM is planned to transport passengers from Terminal 3 to Satellite Hall and Terminal 4 (long-term plan) and equipped with O&M center and other related facilities under ground. The whole line with T3, Satellite Hall, T4 ((long-term plan) and a depot has been well designed. The project will be carried out in two phases and the 1st phase covers T3, Satellite Hall and the depot. The line is located on the basement with 2.6-km mainline and 1-km entrance & exit depot line.

 

  Revenue service with 18 cars is scheduled to be achieved by the end of 2020.

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Previous article
Next article